Quick answer: A concrete invoice template lists your business and licence details, the client and job address, a unique invoice number, and each part of the work as its own line: tear-out and haul-away, base preparation, the pour priced per square foot, finish upgrades, reinforcement and permits. It then shows tax if due, deposits received, the balance and your payment terms.

Concrete work is expensive, physical and hard to undo. Once a slab is poured, the client cannot inspect what is under it, so the invoice is often the only record of the base depth, the reinforcement and the finish they paid for. A clear concrete invoice protects you if a crack appears two winters later, and it gets you paid faster because the client can see exactly where the money went. You can build one in a few minutes with our free invoice generator.

This guide covers what to put on a concrete invoice, how to price per square foot and per cubic yard, typical 2026 price ranges, deposit and progress billing rules, a full worked example, and the billing mistakes that cause disputes.

What a concrete invoice template should include

A homeowner should be able to read your concrete invoice and match every line to something they saw happen on site. Include:

  • Business details: trading name, address, phone, email, logo and your contractor licence number where your state requires it.
  • Client and job address: the billing name and the property where the work was done, if different.
  • Invoice number and dates: a sequential number such as CON-2026-0187, the invoice date, the pour date and the due date. Our invoice number generator can suggest a format.
  • Scope reference: the estimate or contract number the job was based on, so the client can compare.
  • Demolition and haul-away: removal of the old slab, priced per square foot or as a lump sum.
  • Base preparation: excavation, grading, gravel base depth and compaction.
  • Concrete placement: square footage, slab thickness, mix strength and finish type.
  • Reinforcement: rebar, wire mesh or fibre, if not included in the base rate.
  • Finish upgrades: stamping, colour, exposed aggregate, sealer.
  • Pass-through costs: permit fees, short-load fees, pump truck hire.
  • Payments and terms: deposit or progress payments already received, the balance due, accepted payment methods and any late fee you have agreed.

The more specific the description, the stronger your position later. "Driveway, $9,680" invites questions. "720 sq ft driveway, 4 in slab, 3,000 PSI mix, #3 rebar at 18 in centres, broom finish" answers them. That is the difference between a vague bill and an itemized invoice clients trust.

Concrete price per square foot: typical 2026 ranges

Most residential concrete is sold by the square foot, which bundles material, labour, forming and finishing into one number. The ranges below come from published 2026 US cost guides. They vary by region, access, slab thickness and season, so use them as context for your own pricing, not as a price list.

ItemHow it is usually pricedPublished 2026 range (varies by region)
Plain broom-finish slab or drivewayPer square foot, installedRoughly $6 to $12, higher in expensive metros
Stamped or decorative concretePer square foot, installedOften about $12 to $20
Old slab removal and haul-awayPer square foot or lump sumOften about $2 to $7 per square foot
Steel reinforcementAdded per square footOften about $1 to $3 per square foot
Ready-mix concrete (your material cost)Per cubic yard, deliveredCommonly quoted around $125 to $175 per yard
Short-load feeFlat fee or per missing yardVaries by supplier, ask before ordering

Larger pours usually come in lower per square foot because mobilisation, forming setup and finishing crews are spread over more area. Small jobs such as a 40 square foot pad often carry a minimum charge instead. If you are unsure whether your square-foot rate covers your costs, our guide to markup vs margin shows how to check.

Converting square feet to cubic yards

You quote in square feet but buy in cubic yards. The formula is simple: length in feet x width in feet x thickness in feet, divided by 27. A 24 ft by 30 ft driveway is 720 square feet. At 4 inches thick (0.333 ft), that is 240 cubic feet, and 240 / 27 = 8.89 cubic yards. Most contractors order around 10 percent extra for spillage, uneven subgrade and form flex, which brings the order to roughly 9.8 yards, rounded to 10. That number belongs in your job costing, not usually on the client invoice.

Deposits, progress billing and payment terms

Concrete jobs tie up cash fast: you pay for gravel, rebar, forms and a ready-mix truck before the client pays you. That is why most concrete contractors use a deposit, progress payments, or both. How much you can take up front depends on where you work.

In California, for example, the Contractors State License Board says the down payment on a home improvement contract cannot exceed $1,000 or 10 percent of the contract price, whichever is less, unless the contractor has an approved bond on file. See the CSLB home improvement contracts guide for the full rules. Other states set different limits or none, so check your own licensing board.

A common structure for a residential driveway looks like this:

  1. Deposit at signing: within your state's limit, invoiced with a deposit invoice that references the contract.
  2. Progress payment: after demolition and base preparation, where the contract allows it, billed as a partial payment invoice.
  3. Final invoice: after the pour, finishing, joint cutting and clean-up, showing all earlier payments as amount paid.

Homeowners usually pay on completion or within 7 to 15 days. Commercial clients and general contractors often pay net 30 and may hold back retainage. Our guide to invoice payment terms explains the options, and the construction invoice guide covers retainage and staged billing in more depth.

Sample concrete invoice: driveway replacement

Here is an illustrative example. A California contractor replaces a 24 ft by 30 ft (720 sq ft) driveway. The contract price is $9,680. Because of the CSLB down payment rule, the contractor took 10 percent, $968, at signing. In this example no sales tax is added to the invoice, because the contractor paid tax on materials when buying them. Your state may treat this differently.

DescriptionQtyRateAmount
Remove and haul away existing driveway (sq ft)720$3.00$2,160.00
Grade and compact 4 in gravel base (sq ft)720$1.25$900.00
Place 4 in, 3,000 PSI concrete with #3 rebar, broom finish (sq ft)720$8.50$6,120.00
Saw-cut control joints and apply sealer1$350.00$350.00
City driveway permit (pass-through)1$150.00$150.00
Total$9,680.00
Less deposit received 2 Oct 2026-$968.00
Balance due$8,712.00

Check the arithmetic: $2,160 + $900 + $6,120 + $350 + $150 = $9,680. Ten percent of $9,680 is $968, which is less than $1,000, so that was the maximum deposit. $9,680 minus $968 leaves $8,712 due.

How to build this concrete invoice

  1. Open the US invoice generator so the currency and date format are set for American clients.
  2. Add your logo, business name, address and contractor licence number.
  3. Enter the client's name and the job address, then the invoice number, invoice date and due date.
  4. Add each line item with its quantity and rate. Use square feet as the quantity for area-based lines.
  5. Leave the tax rate at zero unless your state requires tax on the invoice. If it does, the sales tax calculator helps you check the figure.
  6. Enter the $968 deposit in the amount paid field so the balance due shows $8,712.
  7. Add notes such as the pour date, curing advice ("no vehicles for 7 days") and your warranty terms, then download the PDF.

A strong, simple design suits trades work. The bold invoice template prints cleanly and keep long line descriptions readable.

Change orders and overruns on concrete jobs

Concrete jobs change on site more than most trades. The subgrade turns out to be soft, the client asks for an extra walkway, or the inspector wants thicker edges. Every one of those changes should be written down before you pour, not argued about after.

  • Extra area: add the square footage at the contract rate in a signed change order.
  • Thicker slab or extra base: price the added material and labour, and note why it was needed.
  • Unexpected demolition: buried slabs, roots or old footings are common. State in your estimate how they will be charged.
  • Short loads and pump trucks: pass these through at cost or with your agreed markup, labelled clearly.

Our guide to change orders and scope creep includes wording you can adapt. On the final invoice, list each change order as its own line with its reference number, so the client can see that every extra dollar was agreed in advance.

Sales tax and paperwork for concrete contractors

Sales tax on concrete work is not uniform across the US. In many states, a contractor who installs materials into real property is treated as the end consumer of those materials, pays tax when buying them, and does not charge tax on the customer invoice. Other states tax certain construction services, or treat material sold without installation differently. Read our overview of sales tax on US invoices and confirm with your state revenue department.

A few other records are worth keeping with each invoice: the signed estimate, any change orders, the ready-mix delivery tickets showing yards and mix, permit and inspection records, and photos of the base and reinforcement before the pour. If you subcontract to a general contractor, you may also be asked for a Form W-9 before payment. This is general information, not tax or legal advice.

Calling 811 and other pre-pour steps that affect billing

Any job that involves excavation should start with a utility locate request. 811 is the free national before-you-dig service, and the 811 before you dig site advises contacting it a few business days before digging. Hitting a buried line can wipe out the profit on a driveway and then some, so note the locate ticket number in your job file.

Other pre-pour items that can change the invoice include permit costs, inspection delays that require a return trip, and weather. State in the contract whether a rain delay that wastes a booked truck is charged to the client, and if so, show it as its own line with the date.

Common concrete invoice mistakes

  • Lump-sum totals with no detail. A single "Driveway: $9,680" line is hard to defend if the client later questions the base or reinforcement.
  • Missing slab thickness and mix. These are the details that matter most if cracking becomes a dispute.
  • Deposits that break state rules. Taking more than your state allows can create licensing problems, even if the client agreed.
  • Unwritten change orders. Verbal extras are the most common reason concrete invoices go unpaid.
  • Forgetting earlier payments. Always show deposits and progress payments so the balance is obviously correct.
  • Waiting to invoice. Send the final invoice the day the job is finished, while the new slab is fresh in the client's mind.

If you also take on general repair work between pours, our handyman rates guide can help you price the small jobs that fill the gaps.

Create your concrete invoice

A good concrete invoice template does three things: it shows what is under the surface, it ties every dollar to the contract or a change order, and it makes the balance due impossible to misread. List the work by square foot, record deposits as amount paid, add tax only where your state requires it, and send the invoice the day you finish. Build your next concrete invoice in the free invoice generator and download a PDF ready to send.

Frequently asked questions

What should a concrete invoice include?

A concrete invoice should show your business name, licence number if your state requires one, the client and job address, a unique invoice number and date, and each part of the job as its own line: demolition and haul-away, base preparation, the pour by square foot, finish upgrades, reinforcement and any permit fees. Finish with the subtotal, tax if it applies, deposits already paid, the balance due and your payment terms.

How much does concrete cost per square foot in 2026?

Published 2026 cost guides put a plain broom-finish slab or driveway at roughly $6 to $12 per square foot installed, with some guides stretching to $16 in high-cost areas. Stamped concrete is often quoted around $12 to $20 per square foot. Removal of an old slab and extra reinforcement are usually priced on top. Treat these as rough national ranges and price from your own costs.

Should I bill concrete by the square foot or by the cubic yard?

Most residential flatwork is quoted and invoiced by the square foot, because homeowners understand area and it already includes your labour and finishing. Cubic yards are how you buy the material from the ready-mix plant. Many contractors calculate yards to price the job, then invoice in square feet. Commercial clients and other contractors sometimes prefer a yard-based or lump-sum breakdown, so match what the contract says.

How much deposit can a concrete contractor take?

It depends on the state. In California, the Contractors State License Board limits the down payment on a home improvement contract to $1,000 or 10 percent of the contract price, whichever is less, unless the contractor has an approved bond on file. Other states have their own rules or none at all. Check your licensing board before setting a deposit and record the amount as paid on the final invoice.

Do concrete contractors charge sales tax?

Often not on the invoice itself. In many US states, contractors who permanently improve real property are treated as the consumer of the materials, so they pay sales tax when buying concrete and rebar and do not add it to the customer bill. Other states tax some construction services or require separate treatment. Check your state revenue department or an accountant before adding a tax line.

How do I invoice extra concrete or a short-load fee?

Agree in the contract how overruns are handled, then show them as separate lines. If the client asks for a thicker slab or extra area, add a change order and invoice the extra square feet at the agreed rate. If a small pour triggered a short-load fee from the ready-mix supplier, list it as a pass-through line with the amount charged, so the client sees why the total moved.

When should I send a concrete invoice?

Small jobs such as a patio or walkway are usually invoiced when the pour is finished and the forms are stripped. Larger driveways, foundations and commercial work are often billed in stages: a deposit at signing, a progress invoice after demolition and base work, and the final invoice after the pour and clean-up. Put the schedule in the contract so each invoice matches an agreed milestone.

Can I use a free invoice generator for concrete jobs?

Yes. A free invoice generator lets you add your logo and licence number, list each part of the job by square foot or lump sum, apply one tax rate, enter a deposit as amount paid and download a PDF. It does not collect card payments or send reminders for you, so email the PDF yourself and record the payment in your books when it arrives.