Skip to main content
Design & Templates

Gate Pass Format: Returnable and Non-Returnable

Gate pass format for returnable and non-returnable material: required fields, filled examples, how to track items sent out for repair, and common control gaps.

By Invoice Creator Editorial Team 8 min read

A gate pass format is a one-page authorisation that security checks before any goods, tools or equipment leave your premises. The returnable version tracks items that must come back, like a motor sent for rewinding, while the non-returnable version covers items leaving for good, like sold stock or scrap. Both serve the same purpose: nothing walks out of the gate without a signed record of what it is, where it is going and who approved it.

This guide gives you a complete gate pass format with every field explained, filled-in examples for both types, a simple register for tracking returnable items, and the control gaps that make gate passes fail in practice.

What a gate pass is for

Factories, warehouses, hospitals, schools and offices use gate passes because the gate is the last place a loss can be stopped. A gate pass does three jobs:

  • Authorisation. Someone with authority approved the movement in advance.
  • Identification. Security can compare the physical items with a written description and quantity.
  • Traceability. The business keeps a numbered record of every item that left, which is essential for assets out on repair or loan.

A gate pass does not replace customer-facing paperwork. Goods sold to a customer still need a delivery challan or a delivery note with proof of delivery, plus an invoice. The gate pass references those documents so security can see the movement is legitimate.

Gate pass format: fields to include

SectionFieldNotes
HeaderBusiness name and siteWhich gate or unit the pass is valid for
Gate pass numberPre-printed or system-generated, separate series for RGP and NRGP
TypeReturnable (RGP) or Non-returnable (NRGP)
Date and time of issuePass is valid only for that day unless stated
MovementIssued to / carried byPerson or transporter, with ID or phone
DestinationVendor, customer, site or branch address
Vehicle numberIf goods leave by vehicle
ItemsItem descriptionMake, model, size; avoid vague words like "material"
Serial or asset tagEssential for equipment on a returnable pass
Quantity and unitPieces, kg, cartons
PurposeRepair, sale, sample, scrap, transfer, demo
Reference documentInvoice, challan, repair order or job sheet number
Return (RGP only)Expected return dateRequired for every returnable line
Actual return date and received byFilled when the item comes back
Sign-offRequested byDepartment and signature
Approved byAuthorised signatory, not the requester
Security checkGuard name, signature, time out

Returnable gate pass example

A packaging factory sends a gearbox and a set of cutting blades to an outside workshop for repair and sharpening.

FieldEntry
Gate pass no.RGP-2026-0147
Date / time out12 Nov 2026, 14:15
Issued toPrecision Rewinding Works, Unit 7, Industrial Estate Road
VehicleWorkshop pickup van, plate as on challan
Item 1Gearbox, helical, 5.5 kW, serial GB-55-20931, asset tag FA-0412, qty 1
Item 2Cutting blades, 600 mm, qty 4 (set)
PurposeItem 1 repair (bearing noise); item 2 sharpening
ReferenceRepair order RO-2026-088, delivery challan DC-0932
Expected return26 Nov 2026
Requested byMaintenance supervisor
Approved byPlant manager
SecurityChecked serial number against pass, 14:15
Returned(blank until return; then date, qty and receiver's signature)

When the items return, stores receive them like any other delivery and note the return on both the gate pass and the register. If only the blades come back, the pass stays open for the gearbox. When the repair invoice arrives, accounts can match it against the repair order and the closed gate pass. Because the gearbox carries an asset tag, the movement can also be noted in the fixed asset register so the asset is never written off by mistake.

Non-returnable gate pass example

The same factory sells 1,200 kg of offcut cardboard as scrap to a recycler.

FieldEntry
Gate pass no.NRGP-2026-0389
Date / time out12 Nov 2026, 16:40
Issued toCity Paper Recyclers
ItemsCardboard scrap, baled, 1,200 kg (weighbridge slip WB-5512)
PurposeScrap sale
ReferenceInvoice INV-2026-1180, rate 0.18 per kg, value 216.00 before tax
Approved byAdmin manager
SecurityWeight verified against slip, vehicle sealed

The math on the invoice is simple: 1,200 kg x 0.18 = 216.00. Security's job is to check that the weight on the weighbridge slip matches the pass and the invoice. Scrap sales are a classic leak, because scrap is easy to under-weigh and rarely counted, so a non-returnable pass with a weight check is worth the effort.

Gate pass register for returnable items

The pass itself controls the exit. The register controls the return. Keep a simple register in a spreadsheet:

RGP no.Date outItemPartyExpected backReturned onStatus
RGP-2026-01453 NovLaptop, serial LT-7741IT repair vendor10 Nov9 NovClosed
RGP-2026-01465 NovSurvey instrument, tag FA-0388Site team B8 NovOverdue 4 days
RGP-2026-014712 NovGearbox + 4 bladesPrecision Rewinding26 NovOpen

Review it weekly. Anything overdue gets a reminder to the requester and the outside party. Anything still out at month end should be listed in the stock or asset count so it is not reported missing.

How to set up a gate pass system

  1. Use pre-numbered passes. Two series, RGP and NRGP, make overdue tracking easy. Paper books in triplicate (requester, security, stores) work well; a shared form in a spreadsheet or app works too.
  2. Define who can approve. List authorised signatories and limits. A supervisor might approve tools; only a manager approves equipment or scrap.
  3. Brief security. Guards should check descriptions, counts and serial numbers, not just look for a signature, and should refuse passes with crossings-out or missing approvals.
  4. Link passes to other documents. Sales need an invoice or challan number; repairs need a repair order; transfers need an internal transfer note.
  5. Close the loop. Security keeps their copy; stores update the register and the stock record when items leave and return.

Gate pass for incoming material and visitors

Some sites also use an inward gate pass, written by security when goods arrive, before stores complete a goods received note. The inward pass records the time, vehicle, supplier and number of packages, so there is evidence of arrival even if the delivery is checked later. Visitor and vehicle passes are separate documents with their own formats; keep them out of the material register.

Designing a printable gate pass format

A gate pass is filled in quickly, often by hand, and read in poor light at a security cabin. Design it for that:

  • Put the type in large print at the top. "RETURNABLE" or "NON-RETURNABLE" in bold, ideally on different coloured paper (for example white for RGP, yellow for NRGP), so a guard can tell them apart at a glance.
  • Pre-print the number. Numbered books stop people writing their own passes on blank paper.
  • Use a ruled item table with at least six lines and columns for description, serial or tag, quantity, unit and purpose. Draw a line through unused rows so nothing can be added after approval.
  • Print the sign-off boxes in a fixed order: requested, approved, security out, and (for RGP) security in and stores received.
  • Size it A5 in triplicate. Half an A4 page is enough and fits standard carbonless books. Copy 1 goes with the carrier, copy 2 stays with security, copy 3 stays with stores.

If you keep a digital version, a simple form in a spreadsheet or office app works: generate the number automatically, require the approver field before printing, and save each pass as a PDF named with its number.

Digital gate passes and QR codes

Larger sites increasingly issue gate passes from their inventory or facility system. The requester raises the pass, the approver approves it on a phone, and security scans a QR code at the gate to see the approved items. The principles are unchanged: separate requester and approver, a clear item list with serial numbers, a timestamp at exit and, for returnable items, a reminder when the expected return date passes. If you move to a digital system, keep exporting the register monthly so you still have a readable record if the system changes.

Gate pass vs delivery order vs challan

It helps to be clear about which document does what:

  • Gate pass: internal permission for goods to leave the gate.
  • Delivery challan or delivery note: travels with the goods to the recipient.
  • Delivery order: an instruction to a warehouse or carrier to release goods to a named party.
  • Invoice: the request for payment.

Common mistakes with gate passes

  • Vague descriptions such as "old material" or "tools", which let anything pass.
  • No serial numbers on returnable equipment, so a cheaper item can come back in its place.
  • Self-approval, where the requester signs as approver.
  • No expected return date, so overdue items are never chased.
  • Blank passes signed in advance and left at the gate.
  • Not keeping an audit trail of cancelled or voided passes; keep them in the book, marked cancelled.

When goods leave because they have been sold, the gate pass should always point to an invoice. If you need one quickly, create it in our free invoice generator, add the gate pass number in the notes, and download a PDF in a couple of minutes without signing up.

Frequently asked questions

What is a gate pass?

A gate pass is a written authorisation that lets goods, equipment or vehicles leave (or sometimes enter) a factory, warehouse or office. Security at the gate checks the pass against the items before letting them through. It is an internal control document: it proves that someone with authority approved the movement, and it creates a record of what left the premises and why.

What is the difference between a returnable and non-returnable gate pass?

A returnable gate pass covers items that are expected to come back, such as a machine part sent for repair, tools taken to a site or samples lent to a customer. It has an expected return date and is closed only when the item returns. A non-returnable gate pass covers items leaving permanently, such as sold goods, scrap or disposed assets, and is closed when the goods exit.

Is a gate pass the same as a delivery challan?

No. A delivery challan or delivery note travels with the goods to the recipient and describes the consignment for the customer, transporter or tax authorities. A gate pass stays inside your business and is checked by your own security. Many companies issue both: the challan for the outside world and the gate pass to control what leaves the gate. The gate pass usually quotes the challan number.

Who should sign a gate pass?

At least two people: the person requesting the movement and an authorised approver, typically a store manager, department head or admin manager. Security signs or stamps when the items physically leave, and again when returnable items come back. Keeping the requester and approver separate is the main point of the control, so one person cannot remove goods on their own authority.

How do you track overdue returnable gate passes?

Keep a gate pass register with the pass number, items, recipient, out date, expected return date and actual return date. Each week, filter for passes with no return date that are past the expected date and send a reminder to the requester and the recipient. Escalate anything more than a few weeks overdue, because unreturned items are often lost assets.

IC

Invoice Creator Editorial Team

Guides on invoicing, cash flow and small-business finance from Invoice Creator, operated by Next Software Development Company. Content is reviewed for accuracy against the fields our own invoice generator produces.

Try the invoice generator

Related reading